DOCKING AND REPAIR PROJECTS

2020

Colombo DD

Dawn Madurai

23 yrs, Mr size coastal oil tanker, arrested by administration. Complete docking attended part at Kakinada part at Colombo.

2015

Batam - Bhavnagar

MV Lady - containor

Vessel was laid up 18 month at Bantam. On board crew tried to fix the main engine with complete overhaul for 45 days. Vessel attended on owners request at batam. Vessel prepared on own power in 3 days with sea trial.

2016

suez- Baniyas- Dubai

MT Ramtin - SuezMAX TANKER

25v yrs, framo (one of only 2 suezmax tankers). Dry-docking of typical suezmax tanker at Dubai. Vessel was grounded in Suez canal badly damaged bow area, due to the failure fuel pump which engine crankshaft. Vessel attended on owners request temporary repair of engine carried out. Sailed with vessel to baniyas back to dubai for dry-dock preparation. Complete camshaft replaced with new fabricated one, with 4 no framo pump overhaul along with other work.

2011

Pasir Gudang - Chittagong

MT Arc- aframax tanker

4 years laid up tankers double banked with no crew on board. Complete reactivation of main engine and aux engines incl windlass, ballast tank valves and framo ballast pump

2013

Tanjung pelepas- Gadani

MT Hero( Herculaes) VLCC tanker

4 yrs laid up tanker with no axillary generator operational due to bearing issue. Main engine not operated for 5 yrs since used as storage tanker.

2019 2020

lagos- chittagong

MT Balva- MR Tanker

23 yrEmergency attendance of vessel at port louis, vessel lost engines due to critical failure and being towed back to port. Vessel attended to investigate ad rectification of the failure. Engines complete overhauled and tried out to surveyor satisfactions, Mr size coastal oil tanker, arrested by administration. Complete docking attended part at Kakinada part at Colombo.

2013

cape town- Nakala

Mv Rambo- sismic

Diamond dredger arrested at cape town for 3 years. Complete reactivation of engines carried out and vessel delivered to Nakala ( MZQ) on own power

2013

Labuan- Chittagong

Mv Vibe ( VIBEKE)- RORO

Romanian built roro laid up for 3 yrs at Labuan with all machineries dismantled reactivated and delivered Chittagong

2018

Aruba- POS- Gadani

MT Pico el Toro- chemical Tanker

3 yrs laid up chem-oil tanker vessel at Caracas- Venezuela, with main engine ( k series ) repair, delivered to gadani- Pakistan .

2019

Lagos- cittagong

MT DIDDI- MR Tanker

Emergency attendance of vessel at port Maputo , vessel’s engines overhauled and tried out to surveyor's satisfaction

2012

Cagliari - Bavnagar

MV Okkai - RORO

18 month laid up vessel at Cagliari - Italy, with twin pielstick engines out of service due to the failure of starting mechanism. Both engine made operational and sailed own power to Bhavnagar

2018

Colombo- Kolkata

MV Focus Admiralty- sisemic

3 yrs laid up seismic vessel at Colombo opl, all machinery out of service. Vessel prepared for own power sailing and IR class inspection for sailing to Kolkata.

2015

Dalian- chittagong

MT Feng - MR tanker

10 yrs laid up vessel at Dalian. Vessel machinery and structure which was exposed to sub-zero temp unattended developed multiple issue. Vessel prepared for own power sailing to Bhavnagar.

2017

Dubai DD

MT Tour 2 - suezmax tanker

12 yrs old suezmax tanker, the cargo pump turbine no1 and no 3. , is not operational despite shore workshop attendance. Complete overhaul of turbine with alignment and adjustment is carried out. Pumps tried out with load

2019

Benin- chittagong

MT URSU- MR Tanker

On the owners request , attended the vessel at cape town which is been towed due to main engine failure, which was initially sailed from Benin on own power. Engine liners overhauled and Sailed with the vessel to Mauritius. Complete overhaul of main engine carried out, survey completed and vessel sailed to Chittagong on own power.

2018

Batam - Bhavnagar

LPG NUSA

Loss of engine power, vessel dropped emergency anchor at batam opl. Vessel attended, investigated the failure cause and repair carried out. Vessel tried out in presence of surveyor satisfactory

2015

Colombo- Bhavnagar

Blue whale- heavy lift carrier

Vessel attended on owners request at Colombo OPL. Main engine bearing & crankshaft failed after sailing drifting south. Main engine made operational with special running condition and sailed to Bhavnagar