OTHER PROJECTS

2015

Sharjah- bhavnagar

LPG Gas Rose

HKC 2013

Complete demolition of Gas carrier as a case study of HKC2013 in view of implementation of the convention at Bhavnagar plot no 5.

2018

Colombo - Bhavnagr

MV Jade- Container

Take over / Port Matters

Arrested feeder container at Galle without fuel prepared for sailing with all court / port formalities with delivery to bhavnagar

2018/19

Bhavnagar

AHT Miss gaunt

Management

Arrested Vessel at Bhavnagar, Handled the project with the support of DG shipping, Dutch consulate and Indonasion consulate .

2014

Pasir Gudang- Bhavnagar

Sky Oceanous - heavi lift carrier

REPAIR/ management

3yrs Laid up heavy lift vessel with Main engine repair. Both the sister vessels loaded with 2 each small barges , delivered with chittagong .

2018

Kochi - bhavnagar

DCI Dredger IX

take over / port matters

Handling of DCI dredger IX, with the seller buyer disputes while taking over of the vessel for final voyoge

2013/14

Durban- Nakala (MZQ)

Genesis ( ex Reflect scorpio)

REPAIR/ management

3 yrs arrested vessel at durban, Dutch built dredger with DC motor propulsion and DC generators which were Totally out of service. Vessel prepared as dump barge for salvage operation at Richard's bay for emptying the coal from sunk suezmax coal carrier " MV Smart" in channel for 6 months. then delivered to Nakala for demolition.

2018/19

Bhavnagar

Tug Northwind

Management

Arrested Vessel at Bhavnagar, Handled the project with the support of DG shipping, Dutch consulate and Indonasion consulate .

2014

Bangcok -Chittagong

Batang Annai- General Cargo

Repair/ management

18 month laid up General cargo vessel. Delivered as a technical and crew manager with main engine reactivation

2014

Pasir Gudang- Bhavnagar

sky Tethys - heavi lift carrier

REPAIR/ management

3 yrs Laid up heavy lift vessel with Main engine repair. Both the sister vessels loaded with 2 each small barges , delivered with Chittagong .