TOWING AND SALVAGES

2013/14

Durban- Nakala (MZQ)

Dredger Piper - Dredger

3 YRS ARRESTED VESSEL AT DURBAN , DUTCH BUILT DREDGER WITH DC MOTOR PROPULTION AND DC GENERATORS WHICH WERE TOTALLY OUT OF SERVICE. VESSEL PREPARED AS DUMP BARGE FOR SALVAGE OPERATION AT RICHARD'S BAY FOR EMPTYING THE COAL FOR 6 MONTHS FROM SUNK SUEZMAX COAL CARRIER ( MV SMART 2013) IN CHANNEL. THEN DELIVERED TO NAKALA FOR DEMOLITION. https://www.youtube.com/watch?v=XVy3km3ujq4

2014

Sibolga ( Indonesia)- Chittagong

First Kasih- suezmax Bulk carrier.

5 YRS LAID UP RUSSIAN VESSEL MANNED TOW PREPARATION WITHOUT ANY SHIPS POWER SUPPLY.

2019

Goa- Bhavnagar

MV Qing - passenger vesssel

COMPLETE MANAGEMENT OF THE PROJECT -1200 CABIN PASSENGER VESSL MV QING, RESTED ON SEA BED ALONGSIDE WIS IN 2016 WITH 12 MTR DRAFT. VESSEL PREPARED FOR THE FINAL DESITINATION UNDER MANNED TOW. LINK - https://www.youtube.com/watch?v=h6Hmm1_BGOU

2017/18

Port Gentil

MT Order-carrier tow

COMPLETE MANAGEMENT OF UNDER TOW VESSEL MT ORDER WITHOUT ANCHOR , UNDER DISTRESS AT PORT GENTIL -GABON OPL DUE TO THE ENGINE FAILURE OF AHT CARRIER. ATTENDED THE TOW ON OWNERS REQUEST HANDLING PORT ATHORITIES, CUSTOMS,SUPPLY, REPAIR AND SURVEY

2019

WALVIS BAY- CAPE TOWN

AHT AMANDALA- MT URSU

PREPARATION / CONNECTION OF THE TOW INCLUDINING LOCAL PORT CONTROL NEGOTIATION

2019- 2021

ABUDHABI

TUG NORTHWIND

COMPLETE TECHNICAL AND CREW MANAGEMENT OF THE TUG NORTHWIND FOR ADNOC PROJECT ( GHASHA ISLAND) FOR 2 YRS

2022

DUBAI - YANBU

TUG NORTHWIND

COMPLETE MANAGEMENT OF DOUBLE TOW ( VINDOS IV AND OCEANIS)

2023

NORWEY - JAKARTA

TUG NORTHWIND

COMPLETE MANAGEMENT OF DEEP SEA TOWOF 5 NO PIPES OF 650 MTR LENGTH x 2 MTR DIA